Chapman University Lastinger Athletic Complex

Project Information
Location: Orange, CA
Market Sector:
Sports & Entertainment
Size: 271,693 SF
Parking spaces: 900
Floor levels: 2

Chapman University Lastinger Athletic Complex parking structure

Project Description

The Lastinger Athletics Complex Parking Structure continues International Parking Design's longstanding partnership with Chapman University in Orange, California. Constructed beneath the campus athletic field, the 900-space garage maximizes land use while preserving valuable open space for athletic and recreational activities. Delivered using the design-build method, the facility features a four-bay layout with 90-degree parking, two-way traffic circulation, and a single helical ramp that provides efficient vertical circulation.

The cast-in-place concrete structure incorporates spread foundations, long-span post-tensioned beam-and-slab framing, and shear walls in both directions to provide seismic resilience. Painted interior finishes create a bright, open environment that enhances visibility and the overall parking experience.

Our Role: Architect of Record
Delivery Method: Design-Build

Credits
Owner: Chapman University | General Contractor: Bomel Construction Co., Inc.

Chapman University Lastinger Athletic Complex parking entrance